mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

i'm very confused , can anyone help?
How do trade agreements help the countries involved?
Oxidation is the reaction of a substance with oxygen to form a new substance. This is an example of a chemical change. True False
I need help on this question!
I have been stuck on this one any one please help thank you
Solve the equation 4^(x+5)=16 (x-3)
A machine can label 339 jars in 3 hours. If the rate of the machine was doubled, how many jars would be labeled in 11 hours at the new rate?
consider the inequality -5(x+7)<-10. write an inequality representing a solution for x.
who was primarily responsible for the cold war the soviet union or united states
Determine the median and the first and third quartiles for 1117, 1465, 513, 437, 1038, 954, 650, 893, 456, 1018