hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

which of the following best exlplains why property rights are neccesary in a free-market system?
What is the value of the expression???
Can you please help??
6. Which is a waxy, fatlike substance found only in animal products? amino acids cholesterol vitamins
Please answer Correctly for brainly
A balloon is floating freely at a rate of 0.87 m/s due south. A southerly breeze (coming from the south) blows against the balloon with a velocity of 0.32 m/s.
Which of these is a short-term effect of alcohol? A) headaches B) Hugh blood pressure C) nerve damage D) alcoholic hepatitis
QUICK HELP PLEASE WILL GIVE BRAINLIEST
In 3-5 sentences, describe the developments that occurred in Georgia after it became a royal colony.
what is the coordinate of the midpoint of line segment Q(-3,14) and R(7,5)