maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

The thunderbolt bobsled team is training for Olympic Gold. During practice they start a run with a speed of 0.57 m/s, they complete the 1360 m run in 89.49 seco
Alicia has 32 stickers. This is 4 times as many stickers as Benita has.  How many stickers does Benita have?
what does a ballad consist of?
Can you show me how to divided 33 into to two groups so the ratio is 4 to 7 show me all the work
what is the square root of 2500????
toussaint L'Overtture led a revolt that eventually resulted in independence for what country
Which two hormones are secreted from the same gland but oppose the action of one another?
toussaint L'Overtture led a revolt that eventually resulted in independence for what country
What is 9 divided by 160
a 5 ft ladder is leaning against a 4 ft wall. how far must the bottom of the ladder be from the base of the wall so that the top of laddet rests at the top of w