leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

pllzzzzzzzzzzzzzzzzz ​
what is 500 x 200 + 300 - 400 =
Chi needs to simplify the expression below. (1.25 -0.4)-7+4x3 Which operation should she perform first?I need an answer quickly ​
Write an article on the topic" Energy crisis and it's solution in Nepal"​
NEED HELP ASAP David is shopping for new tires for his 4-wheel-drive truck. In addition to the price of the tires, there is a 10% sales tax plus a state-mandate
what is known as Ip address​
A rubber ball and a steel ball are dropped from the same height onto a concrete floor. They have the same mass, and lets assume that they both rebound to the sa
Write the coefficient of x².​
simplify√50-3√2(2√2-5) -5√32​
5. Which events is used to code on any form load a) Form Text b) Form Code c) Form Load d) Form Data