medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

The withdrawal of eleven Southern states from the Union in 1860 which precipitated the American Civil War 1860 Election Secession Populism Dawes Act
How many amendments, or changes, are there to the U.S. Constitution? a. 27 b. 14 c. 33
what is database of computer ?
Which battle produced the bloodiest day of the Civil War?
i am having trouble on a math problem for over the summer Use the distributive property to express the sum of 48+84 as a multiple of 2 numbers with no common fa
Where does the Liberty Bell hang?
Rewrite the rational exponent as a radical by extending the properties of integers exponents. 2^3/4 / 2^1/2
If you visit the National Mall, where are you? a. Minneapolis, Minn. b. New York City, N.Y. c. Washington, D.C.
What is the source of the following phrase: “Government of the people, by the people, for the people”?
The 555-foot-tall Washington Monument in Washington, D.C., is an example of which of the following types of structures? a. pyramid b. geodesic dome c. obeli