kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Multiply 5x2(2x2 + 13x − 5).
ENGLISH Q1. Your parents are both working in multinational companies and today they both are attending important meetings and will get late. You are feeling lon
Each verbal expression or equation contains highlighted words that correspond to a mathematic operation. Drag a tile to match each highlighted word or phrase.
what is 1/10 of 0.002
I need to buy a new ............. a) pair of jean b) some jeans c) jeans d) none of the above
You are dispatched for a patient who called 911 after what was reported to be a fall from a ladder. On your arrival, the patient admits to having been injured d
Students in a statistics class examined individual student test scores for a large group of students. Each test score is paired with the reported time the stude
a proposition received a yea to nay ratio of .535. what percent of the votes did the proposition win
I need help thankyou
7(y-2) 21=(2y)(3) solve the this linear equation