Jarelle123 Jarelle123
  • 02-07-2018
  • Mathematics
contestada

If a project will take 35 employees 2940 hours to complete how many hours will each employee have to work

Respuesta :

afrazi01p8qv5j
afrazi01p8qv5j afrazi01p8qv5j
  • 02-07-2018
To find out how many hours each employee will need to work, we divide 2940 hours by 35 to evenly split the hours among each of the workers.
2940 / 35 = 84
This means that each employee will need to put 84 hours of work into the project to complete it.

Answer Link

Otras preguntas

Maria dropped four different objects in a vacuum. The graph shows the data she collected. Which statement best describes the data Maria found? Responses A The
What MAD means in math?
The temperature, F, in degrees Fahrenheit, after t hours of a roast put into an oven is given by the equation F=325-185e^-0.4t. What was the temperature of the
Best answer gets brainliest
how may interphsd are in the cell
In a study of the length of several individuals of one species of fish caught, the following observations were recorded. The lengths were measured to the neares
What are the extreme vertices of a unit square?​
I am a neuron; from what part of the brain did I develop?
If a protein-encoding gene contains introns and exons, it is likely that: a) It is a prokaryotic gene b) It undergoes splicing during mRNA processing c) It is o
The two divisions of the ANS have antagonistic effects on each of the following EXCEPT: A. gastrointestinal peristalsis B. the diameter of the blood vessels in